MarkUs Blog

MarkUs Developers Blog About Their Project

Punchlines ECN – 12th December 2012

without comments

Here are the punchlines from our group (students from Centrale Nantes):

Amandine:

Status :

  • Order contents of the final reports
  • Reuse the controller results to get the results of an assignment
  • Creation of the code to insert graphs

Next steps :

  • Repartition of the parts of the final report
  • Continue the views and hope they will run!

Road block :

  • None

Alexy & Nora:

Status :

  • Revert a wrong method to define skills and objective
  • Creation of the reusable concept : when created, a criterion can be chosen as “reusable” with a checkbox. Then, when changing a marking scheme, a reusable criterion can be chosen among a list of reusable criteria. He is then added to the marking scheme (so than he can be edited if needed).

Next steps :

  • Finishing the creation and the implementation of reusable criterion

Road block :

  • None

Nicolas and Sebastien:

Status :

  • Revert our wrong changes to the views.
  • Reflexion on how to adapt the results and home controllers to display the new graphs and marks in the right way and at the right place.

Next steps :

  • Validate the final report’s plan and write the report.

Road block :

  • All other changes we need to do are too long and too complex for us to do it in time.

Antoine

Status :

  • Start adding methods to the controller “assignments” so as to get the data used to display results graphs in the assignment view as a student
  • Start writing the html and javascript to display those data

Next steps :

  • Finish it
  • Work on the final report

Written by amandine.lavergne

December 12th, 2012 at 10:36 am

Posted in Status Reports

Tagged with ,

Leave a Reply