Punchlines for Oct 28

without comments

Kurtis Schmidt

Status

  • Chose Bluff graphing library for MarkUs
  • Integrated Bluff graphing library into MarkUs
  • Created working branch with Hora
  • Began designing graphing framework

Next Steps

  • Generate the graphs

Roadblocks

  • Exams

Hora Hamalghi

Status:

  • still working through my review of issue 117
  • working on preparing grade distribution data for graphing – you should see a review of this soon!

Next steps:

  • finish up preparing grade distribution data
  • figure out how and where to display the grade distribution graphs

Roadblocks:

  • my review of issue 117 has stalled, waiting on some more comments with regard to testing

Evan Browning

Status:

  • Met with Victor, discussed testing framework, security, worked with benjamin’s examples
  • Wrote a blog post giving details on everything that still has to be done on the testing framwork
Next Steps:
  • Add parsing to the examples and write documentation for the examples
  • Fix critical bugs in the testing framework

Roadblocks:

  • Was low on time this week due to other classes

Misa Sakamoto

Status:

  • met up with Karen to discuss paper prototypes and feedback from Diane
  • talked with Paul Gries to hear his feedback on prototype
  • sharing Vivien’s branch and started implementing

Next Steps:

  • continue with implementing

Roadblocks:

  • was sick this week

Vivien Suen

Status

  • Met with Karen to show her our ideas and prototypes
  • Photoshopped together some screenshots of our ideas and posted to blog for feedback
  • Figured out how to share a branch between me and Misa and started implementing

Next Steps

  • Continue implementing and get something up on review board

Roadblocks

  • Midterms this week

Jiahui Xu

Status:

  • Working on issue 98
  • Setting up the work environment for Test Framework

Next Steps:

  • Pick a feature for the test framework from Victor’s blog post and start working on it

Roadblocks:

  • None

Victor Ivri

Status:

  • Nearing the end of the investigation stage, ready to implement prototypes.

Next Steps:

  • Implement prototypes.
  • Further research approach.

Roadblocks:

  • None.

Written by vivien

October 29th, 2010 at 12:40 am

Posted in Uncategorized